East Shore Athletic Club II, Site Improvements, Mt. Pleasant, SC

Chandler Construction Services, Inc. was selected by the general contractor to complete site improvements for a state-of-the art, 20,000-square foot athletic club complex located in the rapidly growing subdivision of Park West. The scope of work included clearing, grubbing, grading, building pad preparation, site utilities, storm drainage, paving and concrete.

Clearing and rough grading were completed on schedule and the building pad was delivered in June 2004. Chandler Construction Services, Inc. worked with the GC to satisfy changing design considerations with regard to underground utilities and storm water drainage. A 6-inch diameter underground fire main and hydrant were added to the scope to comply with interior sprinkler requirements. Placement of concrete curb and gutter, parking subgrade, asphalt paving, lot striping and signage were coordinated along with other trades to meet the owners scheduled opening in December 2004.