.Chandler Construction Services, Inc. proposed to furnish labor, supervision, equipment and materials to complete the following Scope of Work: WATER AND FIRE ? Tie to existing 12 line per plan 1 each ? Supply and install 600 lf of 12 DIP with fittings per plan ? Supply and install 10,500 lf of 10 DIP with fittings per plan ? Supply and install 180 lf of 8 DIP with fittings per plan ? Supply and install 220 lf of 6 DIP with fittings per plan ? Supply and install 2,360 lf of 2 Type K copper with fittings per plan ? Supply and install two (2) 2 gate valves with box per plan ? Supply and install two (2) 8 PIVs per plan ? Supply and install fifteen (15) 10 gate valves with MH per plan ? Supply and install (34) fire hydrants with 6 gate valves per plan ? Supply and install four (4) bollards around each hydrant per plan ? We exclude meters, vaults and fees ? Lines to terminate as shown on plans, but no work within 5 of buildings SEWER ? Tie to existing MH per plan 2 each ? Supply and install 1,105 lf of 8 SDR 35 gravity sewer at depth per plan ? Supply and install 272 lf of 4 SDR 35 gravity sewer at depth per plan ? Supply and install five (5) MH (5,6,7,9 & 10) at depth per plan ? Encase 4 line at crossing per plan 1 each ? Lines to terminate as shown on plans, but no work within 5 of buildings













Chandler Construction Services, Inc. proposes to furnish labor, supervision, equipment and materials to complete the following Scope of Work:

Water and Fire

 

Sewer